Skip to content

Burn-down chart

A budget used up through the month.

Definition · Updated Nov 2, 2026

A burn-down chart starts with a budget and steps it down with each incident or use, against an even-burn line. You see what is left, when it runs out at the current rate and which events took the most. Use it for error budgets, credits and sprint scope.

Pay once. Every update included.

Live preview

Error budget burn-downError budget of 44.6 minutes for October: 27.7 minutes left on Oct 16 after 4 incidents; at the last hour's 6.2× rate it is gone on Oct 19, at 1× 6.8 minutes are left at the end of the month.010 MIN20 MIN30 MIN40 MIN123427.7 minGONE OCT 196.8 MIN LEFTOCT 1TODAYOCT 29BUDGET LEFTAT 6.2×, LAST HOURAT 1×EVEN BURN
Error budget burn-down
DayMinutes leftIncident
Oct 144.6
Oct 244.6
Oct 344.6
Oct 438.51
Oct 538.5
Oct 638.5
Oct 738.5
Oct 838.5
Oct 935.12
Oct 1035.1
Oct 1135.1
Oct 1235.1
Oct 1332.93
Oct 1432.9
Oct 1532.9
Oct 1627.74

Sample data: October error budget, 27.7 min left after 4 incidents

Size
Legend
Data shape
Minutes left per day and numbered incidents
Good for
Error budgets, credits, sprint scope
Avoid when
The budget gets refilled
Sizes
XS, S, M and L, re-laid out from the data

Anatomy

Inspect it like the Figma file.

The same layers, names and tokens as the component. Select one to read its size, fill and style.

Layers

113 / Burn-down

chart/113-burn-down
plot · burn down
Layer
pace · fast
Type
Vector
Size
64 × 140
Stroke
status/warning
Group
Marks · 8

Layers

113 / Burn-down

chart/113-burn-down
plot · burn down
Layer
pace · fast
Type
Vector
Size
22 × 58
Stroke
status/warning
Group
Marks · 8

Sizes

Re-laid out, never scaled.

The same data at XS, S, M and L. Every size is redrawn from the data, so text and line weights never shrink.

M against S

Width360 px480 px

Plot328 px440 px

Labels1717

Marks88

Height212 px246 px

Same tokens at every size: text styles, 1 px lines and mark radius stay put.

When to use

What is left, and for how long.

Three signs it fits, and three signs another type fits better.

Does it only go down?

Used up and refilled.

Yes: Keep the burn-down

Is it a budget for a period?

Spend building up.

Yes: Keep the burn-down

Are the events the story?

One incident in detail.

Yes: Keep the burn-down

Code and Figma

One name in Figma and in code.

Every Figma property is a prop with the same name and values. One command installs it.

Figma

chart/113-burn-down

size
legend
Property = propValuesDefault
size"xs" · "s" · "m" · "l""xs"
legendtrue · falsetrue
color"cat-1" · "cat-2" · "cat-3" · "cat-4""cat-1"
npx shadcn add @chartory/burn-down
burn-down.tsx
import { BurnDown } from "@/components/chartory/burn-down"import { errorBudget } from "./error-budget"export function ErrorBudget() {  return (    <BurnDown      data={errorBudget}      size="m"      legend={true}    />  )}

Hearth widget

Burn-down as a widget.

The chart in a Hearth card with a hero number and two blocks. One token set, light and dark.

Get the code

EmberPreset

ChartoryDefault preset

Pick the blocks, the size and the preset for your own widget.

Read the Hearth widget docs

FAQ

Burn-down questions.

What people ask before they put a burn-down in a dashboard.

Something else?

hello@usechartory.com
  • It comes with the data and the plot marks it (GONE OCT 19); the legend names the rate behind it (AT 6.2×, LAST HOUR). The even-burn line shows a steady 1×.

Related types

The same question, a different shape of answer. Every type ships in Figma and in code.

Same family

Change over time

Trends, levels and seasons across days, months or years.